Flotech PS delivers loading arm gantry for major U.K. fuel terminal

Flotech PS delivers loading arm gantry for major U.K. fuel terminal


Flotech Performance Systems has completed a five-arm loading gantry system project that is destined for a major U.K. fuel terminal.

The Hampshire, U.K.-based company was asked to provide a solution that was not only compliant but purpose met its client’s strict application guidelines. This system was designed according to the client’s requirements and includes:

ST - Flotech copy

  • Additive Solution – The additive system was engineered to suit the users current and future additive requirements.
  • Five Arm Load Controlling – The gantry was designed with multiple loading arms all supported with monitoring, metering and tanker access.
  • Bottom Loading with Vapour Recovery – Suitable for bottom loading of road tankers with API Coupler Connections. The arms were designed to connect to side of the tanker and also cross over to suit the configuration of the tanker connections.
  • Ethenol Blending Skid – Additional to the loading gantry Flotech also supplied a two-stream blending skid for Ethenol

Flotech PS has extensive experience in tanker loading, additive injection, blending and metering solutions.

For more information visit www.flotechps.com

15th Jan 2018